Assignee
Status
Not started
Summary
This document outlines the scope of the tooltip project, including goals of uncovering technical blockers and estimating engineering time, as well as non-goals of evaluating new events and collecting feedback. The next steps include revisiting docs from a previous project and writing a tech spec to share with the product team email alias.
Due
September 17, 2023
Priority
Low
Tags
MobileWebsite
- Goals:
- Uncover any technical blockers to building education tooltips
- Estimate how long engineering will need to build tooltips
- Non-goals:
- Evaluate new events for data team to track
- Collect feedback from cross-functional partners
- Next steps:
- Revisit docs from previous tooltip project from Q1
- Write tech spec and share to product team email alias